Ultra-premium MicroLED video wall with Eleusis Digital Canvas — Cinema Series 7×8, .9mm pixel pitch, 165"×108" (199" diagonal). Includes dedicated media server, AV-over-IP distribution, and streaming integration.
Eleusis Digital Canvas MicroLED
Cinema 7×8 .9mm · 165"×108" (199"D)
Eleusis Clio Media Server
Dedicated media controller
Eleusis White Glove Installation
Factory installation included
Crestron DM NVX 5K Switcher Cards ×3
4×1 AV-over-IP with HDMI & USB-C
Crestron DM NVX 5K Switcher
Standalone switcher with downmixing
Apple TV 4K + WattBox Power
Streaming source + IP power management
Xbox Client Supply
Gaming console integration
Item / Description
Qty
Unit Price
Extended
MicroLED Display System
Eleusis Digital Canvas — Cinema Series 7×8 .9mm MicroLED (165"×108", 199"D)
Immersive surround sound system anchored by Storm Audio ISP Elite 24ch analog surround processor, Wisdom Audio planar magnetic speakers, Powersoft amplification, and ASCENDO subwoofers.
Basalte Eve Plus Mini Sleeve — iPad mini 6 Brushed Black
1
$575
$575.00
Control System Total
$2,325.00
Dedicated Cinema · $261,117.98
Cinema Video System
Scope Investment
$129,505.97
Reference-grade cinema projection system: Barco Heimdall+ RGB laser projector with ultra-wide zoom, Stewart VistaScope EVO masking screen, madVR AI video processing, AVPro matrix switching, and dual Kaleidescape movie servers.
Coastal Source RZ340WT Line Source Razor (Outdoor)
4
$4,495
$17,980.00
Coastal Source RZ350WT Subwoofer Razor (Outdoor)
4
$3,395
$13,580.00
Control
Basalte Eve Plus Table Base + iPad Mini Sleeve
2
$612.50
$1,225.00
Bar Pavilion Total
$256,660.00
Lawn, Pool & Terrace AudioExterior Rear
Zone Total
$209,905.00
Coastal Source 12.0 Line Source Bollard speakers across the lawn, pool, gym terrace, and 'Dog' location. Performance-grade outdoor amplification for all zones.
Coastal Source 12.0 Line Source Bollard ×14
Lawn (×8), Pool (×4), Gym Terrace (×2)
Coastal Source 12.0 Bollard ×4
'Dog' location with factory commissioning
Coastal Source B18SW15BN-INV Subs ×5
18" Bollard subwoofer with phase inverter
Factory Install — 'Dog' Location
Shipping, calibration & commissioning
Item / Description
Qty
Unit Price
Extended
Lawn Audio ($113,950)
Coastal Source 12.0 Line Source Bollard — Lawn
8
$12,495
$99,960.00
Coastal Source B18SW15BN-INV 18" Bollard Sub — Lawn
2
$6,995
$13,990.00
Pool Audio ($70,965)
Coastal Source 12.0 Line Source Bollard — Pool
4
$12,495
$49,980.00
Coastal Source B18SW15BN-INV 18" Bollard Sub — Pool
3
$6,995
$20,985.00
Gym Terrace Audio ($24,990)
Coastal Source 12.0 Line Source Bollard — Gym Terrace
2
$12,495
$24,990.00
'Dog' Location Audio ($63,480)
Coastal Source 12.0 Line Source Bollard — 'Dog' Location
Full project labor across all phases: project management, engineering, trim, final installation, DSP configuration, programming, and temporary IT/CCTV relocation during construction.
Project Management — $78,000
Full lifecycle PM oversight
Engineering & Documentation — $55,000
As-built drawings, system documentation
Trim Installation Labor — $65,000
All trim-out across entire property
Final Installation Labor — $495,000
Complete final install all zones
Setup, Config & DSP — $55,000
Audio/video calibration, DSP config
Programming Support — $35,000
Crestron / Josh.ai programming
Service
Qty
Unit
Amount
Project Management
1
Fixed Fee
$78,000.00
Engineering & Documentation (As-Builts, Drawings)
1
Fixed Fee
$55,000.00
Trim Installation Labor — All Zones
1
Fixed Fee
$65,000.00
Final Installation Labor — Full Property
1
Fixed Fee
$495,000.00
Setup, Configuration & DSP Configuration
1
Fixed Fee
$55,000.00
Programming — Support Only
1
Fixed Fee
$35,000.00
AHT Labor Subtotal
$783,000.00
Temp IT/CCTV Relocation During Construction
1
Fixed Fee
$8,000.00
Total Labor & Services
$791,000.00
Power Conditioning (Rosewater) · $227,500
RoseWater Energy HUB40.3 — Whole-Home Power Conditioning
Total Investment
$227,500.00
RoseWater Energy HUB40.3: 40 kWh continuous power conditioning with 28.8 kWh standby backup. Eliminates noise, protects against surges, and provides UPS-level protection across the entire AHT system.
RoseWater HUB40.3 — $200,000
40 kWh continuous / 28.8 kWh standby
RoseWater FILTER40 — $6,500
40 kW noise filter for AV loads
Factory Commissioning — $14,000
Hub40.3 factory startup & verification
Delivery & Freight — $7,000
White glove delivery to site
Item / Description
Qty
Unit Price
Extended
RoseWater Energy Group HUB40.3 — 40 kWh Continuous Power Conditioning
1
$200,000
$200,000.00
RoseWater FILTER40 — 40 kW Noise Filter
1
$6,500
$6,500.00
RoseWater Hub40.3 Factory Commissioning
1
$14,000
$14,000.00
RoseWater Energy Delivery Fee
1
$7,000
$7,000.00
Power Conditioning Total
$227,500.00
Executive Summary — Investment by Zone
Zone / System
Investment
% of Total
Share
Family Room (incl. $735K MicroLED)
$933,739
24.5%
Labor & Services
$791,000
20.7%
Exterior AV (Audio + Bar MicroLED)
$733,690
19.2%
AV Headend & Distribution
$307,669
8.1%
Cinema (Barco RGB Laser + Audio)
$261,118
6.8%
Power Conditioning (RoseWater)
$227,500
6.0%
Interior Rooms (All Floors)
$220,394
5.8%
FL Tax, Freight & Misc
$342,747
9.0%
Total Project Investment
$3,817,857
100%
Equipment
$2,656,609
69.6% of total
Labor
$818,500
21.4% of total
Freight & Misc
$92,981
2.4% of total
FL Tax (7%)
$249,766
6.5% of total
Investment Allocation
Total
$3.82M
Family Room — 24.5%
Labor & Services — 20.7%
Exterior AV — 19.2%
AV Headend — 8.1%
Cinema — 6.8%
Power Conditioning — 6.0%
Interior Rooms — 5.8%
Tax, Freight & Misc — 9.0%
Display Technology
$1,065,388
Eleusis Family Room + Bar MicroLED
27.9% of total investment
Outdoor Entertainment
$733,690
18+ zones · Coastal Source + Eleusis
19.2% of total investment
AHT Installation Labor
$791,000
PM · Engineering · Install · DSP
20.7% of total investment
Complete Project Investment
GFS LLC · 26 Star Island
Miami Beach, FL · Q-25766 V3 · Feb 23, 2026
Total Project Value
$3,817,856.72
Equipment & Materials
$2,656,609
Labor & Services
$818,500
Freight & Misc
$92,981
FL Sales Tax (7%)
$249,766
Payment Schedule
Deposit — 50%
Due upon execution of agreement
$1,908,928.36
Prior to Equipment Delivery — 45%
Due prior to delivery of equipment
$1,718,035.52
Upon Completion — 5%
Due upon system commissioning & sign-off
$190,892.84
📋 Key Terms & Notes
· Tariff surcharge clause: pricing may adjust if new tariffs enacted after execution — limited to actual cost increase with documentation
· Network hardware licensing (3-year term from substantial completion); renewal required at term end
· Proposal valid for 5 days per AHT terms; non-cancellable without written agreement
· AHT labor warranty: 1 year on labor only · Equipment warranties per individual manufacturers
· Florida Construction Lien Law disclosure applies (§713.015 Florida Statutes)
· Client-supplied items: B&W CCM speakers, MBL 101SE MKII, CSeed N1 137", Xbox units — not included in pricing